Bricklayer costs typically range from £240 to £320 per day. Hourly rates can range from £32.50 to £37.50. Bricklaying costs per 1,000 bricks can be from £650 to £1,790, with handmade bricks potentially costing £950 to £3,900.
Expert bricklayers are an essential requirement when you want to construct a new wall or extend your property, or manage the weathering of an older building. What will be the total expenses for hiring a bricklayer throughout the UK territories during 2025? The price of hiring a bricklayer depends on multiple specific elements, which include project difficulty and location-based labour pricing, along with material selection.
This bricklayer cost guide outlines the standard expense structure for hiring a bricklayer who performs wall construction and repointing work using the per square metre rate approach, so you can accurately forecast brickwork project expenditures.
The professional costs for bricklaying depend heavily on the physical size of the work, along with its complexity together with where you are located across the UK. Check here for bricklaying service expenses.
The fees charged by skilled bricklayers fall within the range of £150 to £250 for their daily work. Standard bricklaying operations determine the daily rate, which changes due to tradesperson expertise and work location and job difficulty factors. You should anticipate higher fees in London, along with the South East region, due to the combination of increased customer demand and greater operational costs.
The construction of a 1-metre tall wall extending over 5 metres needs an investment in the range of £400 to £800. The price estimate typically involves costs for labour and materials, yet specific verification with your contractor regarding coverage of your payment is required.
The process of repointing focuses on refreshing mortar between bricks to protect both the stability and the cosmetic quality of external walls. This service typically spans between £20 to £50, with the rates calculated according to each square metre of area. The prices for repointing older or listed buildings require additional care and specialist materials, resulting in increased costs.
The expenses for constructing new garden walls measure £60 to £120 every square metre of wall space. Constructing new garden walls will cost from £60 to £120 for each square meter. Brick price determination depends on using specific materials while taking into consideration the wall dimensions and optional decorative elements.
When purchasing materials ahead of time and needing bricklayers for implementation, the labour-only rate falls between £40 to £80 per square metre. The option offers you more flexibility to select materials at trade prices, which makes it an economical choice if you already have your bricks or blocks arranged.
A skilled bricklaying profession determines the final project expense by several essential elements:
The construction industry charges higher wages in London as well as the South East than in the North of England and Scotland, and Wales. The rates charged by bricklayers show a wide variation from £250 daily wages in central London up to £150 in Leeds and Glasgow.
Work nature influences construction costs to a great extent.
Costs rise because of challenging working conditions that include poor access to sites and steep terrain alongside high work positions. Using scaffolding during the work process will lead to increased expense levels.
Bricks that reach premium standards, along with decorative patterns like Flemish bond and herringbone, have prices that exceed basic common bricks. Specialist mortar, together with reclaimed bricks, raises the overall expense of the project.
Projects that span an extensive scope tend to get better rates due to larger order volumes. Clients typically get a reduced price per metre when they need extended construction work.
Pressure to fix broken brickwork and construct brief walls, along with minor touch-up projects, causes most bricklayers to adopt a daily billing system. In 2025, the typical rates are:
Labour-intensive jobs extending to multiple weeks require teams to construct large builds however, state projects usually take just one or two days.
Most bricklayers invoice clients based on square metre measurements during new wall construction efforts. The expense of materials, together with the supply source, determines wall construction costs.
The labour expense for projects that require suppliers' materials falls within a range of £40 to £80 per m². The overall cost takes shape from the wall height, together with bond style and access conditions at the site.
A bricklayer charging for the supply of both materials and labour will request prices ranging from £60 to £120 per square meter. The price of basic bricks remains affordable, while decorative and heritage bricks will increase the overall expenses.
For load-bearing or foundation walls: £100 – £150+ per m². Damp proofing and any necessary groundwork, alongside the required additional equipment and workers, determine the final price of this work.
Brick wall building expenses depend on the wall design, along with its materials and needed final finishes. Different types of walls will require these expenses during construction:
Simple garden walls serving decorative purposes along with boundary functions begin at the following costs:
Boundary walls achieve their height of between 1.5 to 2 meters while using two layers of walls to create strength and privacy.
Internal partition walls serve two functions during home renovations or house conversions by separating rooms while generating new interior design spaces.
Building walls for home extensions calls for intricate procedures since they need to integrate structurally with the present property.
Older brick buildings need repointing to stay intact. A damp proofing process must start by extracting damaged mortar, then follow with new protective mortar applications.
The final costs depend on several factors, including the chimney's vertical dimension, construction design together with the level of ease in achieving the construction site.
Costly expenses accrue from scaffolding installations as well as heritage brickwork maintenance, together with access systems that require reaching high elevations.
Project planning for bricklaying requires proper budgeting because several hidden expenses naturally surface after initial estimates. The supplementary expenses increase substantially what you will spend in total.
Companies must use scaffolding equipment for projects that require working at elevation, including chimney construction or second-story wall installation or boundary wall construction that extends higher than one storey. The expense for scaffolding depends on both structural dimensions and project length and extends between £300 and more than £1,000. The price will increase when hiring requirements become intricate or when extended rental periods are necessary.
Bricklaying operations that require demolishing walls, together with their removal, result in high amounts of debris and waste material. Disposal of this material requires either a hired skip or a grab lorry arrangement. The waste removal cost ranges between £100 to £300 based on the amount of materials and your location details.
Proper foundations play an essential role in guaranteeing structural stability for most brick walls, especially boundary and extension walls. Provision of concrete footing for walls causes expenses ranging from £80 to £120 per linear metre. The procedure involves digging excavation spaces, followed by concrete pouring, before preparing ground surfaces for brickwork. Amazon's Preassembly differentiates between £100 and £300 depending on the amount of waste disposal and delivery location.
Your project cost will substantially increase based on the type of bricks you select for construction:
Quality stays intact when you adopt these few measures to lower your expenses:
The costs of bricklayer work vary widely across different geographic locations throughout the United Kingdom. In different UK regions, you will find these estimated costs for bricklaying services:
Professional bricklayers charge between £150 – £250 daily monies or £60 – £120 per square meter for wall building tasks. The cost of repointing services ranges between £20 to £50 for each square meter of wall area, and specific charges apply for chimney work and difficult access locations.
A professional bricklaying investment provides excellent value for money despite variations in prices affected by project location and size, and choice of materials. Quality brickwork delivers a beautiful appearance and boosts both the long-run property value together with its structural integrity.
Costs of various services and materials in this cost guide should be taken as estimates. These depend on location, preference and demands in the market.